The General Contractor was responsible for erecting two Cogeneration Units at the Napanee Site and tying them into the existing power grid at the Bath GS.
Liburdi was subcontracted by the General Contractor to fit and weld the high pressure steam lines (9 Chrome) and the cold reheat steam lines in position.
Due to physically limited access and the requirement to weld the exotic alloys, Liburdi was able to use their H-Heads (GTAW) to not only access the difficult locations but to weld the 9 Chrome with no added difficulty.