To design, fabricate and test the equipment required to repair multiple welds on four of the Calandria Relief Ducts (CRDs). To build applicable mockups, train and test the execution crew and perform the execution of the work while on site.
Liburdi was awarded the entire scope of the project from design and execution contractor, to post job wrap-up.
By using Liburdi, the Owner/Client was able to resource a single contractor as a vertically integrated team to perform the engineering, design, manufacturing, testing, qualification and execution of this prototype project.